The Maintenance Department is responsible for maintaining street signage in the Township. Examples of such include, stop signs, speed limit postings, directional signs, and street identifying signs.   

Pavement markings are also maintained by the Maintenance Department. These markings include street striping and directional markings. Street striping clarifies the width of lanes and passing or no passing zones. Directional markings identify school zones, crosswalks, stop bars at traffic signals or stop signs, and arrows identifying turn lanes.

County roads maintained by the Hamilton County Engineers Department include:        Kenwood Road, Galbraith Road, Blue Ash Road, Grooms Road, Kemper Road, Fields Ertel Road, Sycamore Road, Euclid Road, Ken Arbre Road, portions of Kugler Mill Road, and the west side of Hosbrook

State roads maintained by the Ohio Department of Transportation include:
Montgomery Road, I-71, Reading Road and Ronald Reagan Highway/State Route 126

_________________________________________________________________________

This year the Township is doing another large road re-surfacing project which involves the "milling" of old surface asphalt and the resurfacing with new. Also included will be curb repairs where needed.  Listed below are the streets that will be included in the project. Unless noted, all construction will  include the entire length of the road. 

If you have any questions, or concerns, please contact Tracy Kellums, Maintenance Superintendent at (513) 792-7257.  As with all construction projects, there will be some inconvenience; but with your patience and cooperation, we will work to keep this to a minimum.

•Blossom Drive 
•Woodlawn Avenue
•Finley Lane   
•Applewood Drive 
•Valerie Court  
•Winesap Court 
•Pleasantwood Court 
•Needlewood Court 
•Smallwood Court 
•Widhoff Lane 
•Orchard Lane 
•Highton Court 
•Darnell Avenue 
•Bayberry Drive 
•Decima Street 
•Shagbark Drive 
•Elmcrest Lane 
•Tulipwood Drive  
•Firethorn Court 
•Chetbert Drive 
•Farwick Court 
•Vorhees Lane 
•Williams Avenue 
•Lancaster Avenue 
•Tudor Avenue 
•Beryl Avenue 
•Crystal Avenue 
•Daffodil Avenue 
•Emerald Avenue 
•Estermarie Drive 
•Huddleston Drive 
•Jud Drive 
•Styrax Lane 
•Duneden Avenue 
•Spirea Drive 
•Largo Drive 
•Alhambra Court 
•Dartmoor Court 
•Donna Lane (Estermarie to Darnell) 
•Donegal Drive (Wexford to West 970')
•Frolic Drive (Styrax to 200' North of Duneden)
•Glenmill Court (West end portion)
•Brookbridge Drive (Millview to North 700')
•Hosbrook Road (North cul-de-sac)
•Lyncris Drive (Sandymar to South 1000')

-------------------------------------------------------------------------------------------------------------------------------

An asphalt rejuvination progam will begin on Thursday, August 7, 2008 and last for a period not to exceed four (4) days.  This project is being done to extend the life of Township road pavement work that was completed in 2007.   Click here to see a schedule of when the road work will be performed in your neighborhood. Any concerns should be directed to the contractor:

Pavement Technology, Inc.
24144 Detroit Road
Westlake, OH 44145
1-800-333-6309